|
Recent mining experience
Open pit
- Freeport Mine, Indonesia – Continuing review and risk evaluation after major 2003 incident
- Lihir (PNG), Mt Keith, Century, and Kidston open pits (review and detailed design with a long-term permanent operational geotechnical role)
Slope stability projects
- Lihir, PNG – geotechnical assessment following a major landslide of their main access road
- Chatree and Chatree North, Thailand - continuing geotechnical pre-feasibility studies
- Siana Gold Project, Phillipines – scoping, pre-feasibility and bankable feasibility studies
- Peak Hill Gold Mine, NSW – continuing
|
|
Underground
- Cibaliung, Indonesia – feasibility and continuing operational assistance
- Victor South, Longshaft, WA – numerical modelling, including room and pillar design, stoping guidelines and sequencing
- Beaconsfield Gold Mine, Tas – life of mine planning

|
|
|